Land of the Cross-Tipped Churches

Details

  • DesignationState Byway (1998)
  • LocationOH
  • Length38.4 miles
Dedicated Byway Visitor Information
Greater Grand Lake Visitors Region
Statewide Byway Partners
Ohio Department of Transportation
Tourism Ohio
Land of the Cross-Tipped Churches
ODOT-Tom Barrett Photo

Overview

The Land of the Cross-Tipped Churches Byway travels through Shelby, Auglaize and Mercer counties, beginning in McCartyville. It then travels along State Route 119 to Fort Recovery, and proceeds north along State Route 49 until it ends at State Route 29 west of Wabash. This 38.4-mile long scenic route encompasses many of the grand historical aspects of the early settlers of the region. An array of cross-tipped churches can be viewed endlessly as one travels through this virtually level farming region. These structures were entered into the National Register of Historic Places in 1979.

 Update this byway information today!